Logo
Marcus Neubacher's Collection
 
4/25/2024
 
 
 
 
 
By:Marcus Neubacher
Dates:1/14/2007 - 1/14/2007
Album Info:This album covers signal and switch changes at Kannapolis and North Kannapolis.
  Page Controls   View:  Pics Per Page:
NS 119
Title:  NS 119
Description:  NS 119 was the first train to move under signal indication from the new signals at Kannapolis.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:38 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives:  NS 9595(C40-9W)
Views:  401   Comments: 0
NS 156
Title:  NS 156
Description:  Northbound 156 rolls into Kannapolis and under the newly installed signal cantilever.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 8:19:27 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives:  NS 9885(C40-9W)
Views:  392   Comments: 0
NS 173
Title:  NS 173
Description: 
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:39 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives:  NS 9557(C40-9W)
Views:  332   Comments: 0
NS 213
Title:  NS 213
Description:  NS intermodal train 213 passes under the traditional Southern Railway signal at Kannapolis. After the passage of 213 and 338, contractors and signal crews will take that signal down and replace it with a new cantilever and hooded signals.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:40 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives:  NS 9125(C40-9W)
Views:  456   Comments: 0
NS 337
Title:  NS 337
Description: 
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:37 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives:  NS 9000(C40-9W)
Views:  355   Comments: 0
NS 338
Title:  NS 338
Description:  NS 338 kicks up the leaves as it takes the signal at Kannapolis. This was the last train to move under the old signals. Shortly after 338 passed, contractors and signal maintainers went to work to replace the old bridge with a new cantilever.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:41 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives:  NS 9014(C40-9W)
Views:  486   Comments: 0
Signal crews get ready
Title:  Signal crews get ready
Description:  A contracted crew and NS employees prepare to install the new cantilever at Kannapolis.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:42 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  237   Comments: 0
Last of the old bridge
Title:  Last of the old bridge
Description:  The leg from the east side of the signal bridge was the last to go.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 8:16:28 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  190   Comments: 0
New overhead signals are lifted
Title:  New overhead signals are lifted
Description:  The new assembly is hoisted into position.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:42 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  227   Comments: 0
New cantiliever attached
Title:  New cantiliever attached
Description:  Crews have attached the new cantilver and prepare to wire it. At exactly 12:00 noon, the lights went out on the old signals. The older style head on Main One is temporary until the new unilateral switch is installed at North Kannapolis. The heads will be reconfigured as two-light over two-light to give an "Approach Diverging."
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:44 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  252   Comments: 0
Out with the old
Title:  Out with the old
Description:  With the new signals positioned, the crane is moved and strapped up to the old signal bridge. Within an hour or so, it will be gone.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:44 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  217   Comments: 0
Cutting it down
Title:  Cutting it down
Description:  A contractor torches the Southern's home-built signal bridge. Southern Railway built these signal bridges using center sills from scrapped freight cars.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:45 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  217   Comments: 0
Sparks fly
Title:  Sparks fly
Description:  Another contractor cuts into the other side of the Southern signal bridge. Who will finish first?
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:46 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  208   Comments: 0
First break
Title:  First break
Description:  The east side of the signal bridge was the first to break free. The west side would take a little more work with a sledge hammer and torch.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:46 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  197   Comments: 0
Away it goes
Title:  Away it goes
Description:  Both sides of the overhead portion of the old signal bridge are now free.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:47 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  191   Comments: 0
Steady as she goes
Title:  Steady as she goes
Description:  The overhead portion of the old signal bridge at Kannapolis is lowered onto the flatbed of the crane truck. Soon they'll drive the truck downtown and offload it onto another flatbed. Before the day is done, the vertical pieces will be gone too. All that remains of the old signal bridge now is a pair of concrete bases.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:48 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  296   Comments: 0
Easy does it
Title:  Easy does it
Description:  The old signals at Kannapolis are lowered as workers continue wiring the new signals.
Photo Date:  11/12/2006  Upload Date: 11/12/2006 6:31:40 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  510   Comments: 1
Amtrak 80 at North Kannapolis
Title:  Amtrak 80 at North Kannapolis
Description:  Pictured is the last train to use the equilateral #20 turnout at North Kannapolis. The switch is being replaced with a unilateral switch as part of the NCDOT high speed project.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:06 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives:  AMTK 138(P42DC)
Views:  427   Comments: 0
Kannapolis project
Title:  Kannapolis project
Description:  The new signals at Kannapolis are being reconfigured as appropriate for the new alignment at North Kannapolis.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:12:55 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  211   Comments: 0
Kannapolis project
Title:  Kannapolis project
Description:  Compared to all of the hustle and bustle at North Kannapolis. the scene at downtown Kannapolis is quiet. The new Amtrak "leaving signal" can be seen just north of hte station platform.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:12:57 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  193   Comments: 0
North Kannapolis changes
Title:  North Kannapolis changes
Description:  Track crews prepare to remove the equilateral switch at North Kannapolis.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:12:58 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  220   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  The new alignment of the single track approach to North Kannapolis is nearly complete. There's a lot of fine-tuning to be done before trains can run, and work will continue even after traffic resumes.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:01 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  205   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  Here's an overview of the construction site as an army of personnel await track time after the passage of Amtrak 80.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:12:59 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  205   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  Showtime! Track crews tear into Mains One and Two at North Kannapolis as the project gets underway.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:00 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  192   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  Contractors turn the old Southern Railway signals on the signal bridge at North Kannapolis, officially taking the signals out of service forever.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:12:55 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  220   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  The new northbound signals are powered, the old ones are turned, and crews are aligning Main One, the new diverging route, where it will join the new switch into single track.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:02 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  207   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  The equilateral switch is gone and track crews begin grading for the realigned single track. Crews will move the single track slightly to align with Main Two, proving a straight route for Amtrak trains.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:03 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  213   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  The new switch is in place and the new southbound signal has been activated. The single track has been realigned to connect to Main Two. There's still a lot of work to do though.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:04 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  202   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  The vintage Southern Railway signals at North Kannapolis are now dead, turned sideways and ready for removal at a later date. Note the remnants of Main One's approach to the old switch.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:05 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  204   Comments: 0
North Kannapolis project
Title:  North Kannapolis project
Description:  My parting shot shows a tamper and ballast regulator working on the new single track alignment.
Photo Date:  1/14/2007  Upload Date: 1/14/2007 9:13:05 PM
Location:  Kannapolis, NC
Author:  Marcus Neubacher
Categories: 
Locomotives: 
Views:  207   Comments: 0


Site Design ©2001-2020 Tim Huemmer
Photos © respective authors
  Contact: info@rrpicturearchives.net